Solar advice, grants and quotes across Ireland

TAMS solar grant 2026: rates, tranche dates and the SEAI alternative

  • Home
  • Home
  • Blog
  • Blog
  • TAMS solar grant 2026: rates, tranche dates and the SEAI alternative

The TAMS solar grant, officially the Solar Capital Investment Scheme (SCIS) under TAMS 3, is the Department of Agriculture, Food and the Marine’s grant for solar PV on farms. It pays 60% of eligible costs, the best rate available to farmers. But it has become very competitive, and from October 2026 SEAI’s business solar grant offers a strong alternative with no tranche wait. This guide sets out the rules, the current tranche dates and how to choose. All facts were checked 25 October 2026; DAFM terms change between tranches, so check the current scheme documents before applying.

How the TAMS solar grant works

  • Grant rate: 60% of eligible investment (Teagasc). Eligible cost is the lower of DAFM’s reference cost and your actual cost.
  • Investment ceiling: SCIS has its own €90,000 ceiling, separate from the €90,000 for other TAMS 3 schemes. For a registered farm partnership, the solar ceiling stays at €90,000.
  • Sized to the farm: annual generation should not exceed the farm’s annual demand, shown in an On Farm Solar PV Survey submitted with the application. The maximum grant-aided size has been reported as 62kWp (Agriland, January 2026).
  • Batteries: eligible at 60%, capped at 50% of panel capacity under the rules at launch (Irish Farmers Journal).
  • Farmhouse: from Tranche 11 (March 2026), DAFM signalled that grant aid would focus on on-farm use and exclude domestic dwellings (DAFM, Agriland).
  • No work before approval: starting before you receive approval makes the investment ineligible.

Teagasc’s dairy guidance gives a sizing rule of thumb: maximum kWp ≈ annual consumption (kWh) ÷ 950 (Teagasc). A farm using 30,000kWh a year would be looking at roughly 31kWp.

TAMS solar grant tranche dates and selection rates

TAMS runs in tranches, and recent tranches have used ranking and selection because of budget limits. Solar has been one of the hardest schemes to get approved:

TrancheKey factsSource
Tranche 1010% of SCIS applications selectedDAFM, 3 Mar 2026
Tranche 12Closed 19 June 2026; 10% of SCIS applications selectedAgriland, Aug 2026
Tranche 13Closed 4 September 2026; 463 SCIS applications; selection results not yet reportedAgriland
Tranche 14Opened 5 September 2026; closes 4 December 2026Agriland
checked 25 October 2026. Selection rates for later tranches may differ.

By comparison, Agriland reported 100% selection for the Farm Safety scheme in Tranche 12. The Irish Farmers Journal (7 October 2026) summed it up: TAMS changes “significantly restricted eligibility”, with only around 10% of solar applications successful.

The SEAI alternative: Non-Domestic Microgen Grant at 45%

Farm businesses can apply to SEAI’s Non-Domestic Microgen Grant. For new applications from 6 October 2026 to 6 July 2027, SEAI pays the lower of its grant table and 45% of the invoiced cost, up to €325,200. The Irish Farmers Journal noted this rate isn’t available to existing applications, there’s no ranking or tranche wait, and unlike TAMS there’s no battery grant. Key conditions: an SEAI-registered installer, a signed contract before applying and no work before the letter of offer.

TAMS 3 SCISSEAI Non-Domestic Microgen
Grant rate60% of eligible costLower of grant table and 45% of invoiced cost (new applications 6 Oct 2026–6 Jul 2027)
Ceiling€90,000 investment ceilingMaximum grant €325,200
BatteriesEligible (capped at 50% of panel capacity at launch)No battery grant
SelectionRanking and selection; about 10% of SCIS applications in recent tranchesDirect application, no tranche
SizingGeneration not to exceed farm demandPer SEAI terms; one system per MPRN
Sources: Teagasc, Irish Farmers Journal, Agriland, SEAI; checked 25 October 2026.

Don’t double-fund

You can’t use both schemes for the same installation. SEAI’s terms and conditions don’t allow aid to be combined with other grant schemes, and DAFM has said it will apply a 100% penalty to solar found to be double-funded (Agriland). Pick one route per installation and keep your paperwork.

Tax relief on farm solar

The Accelerated Capital Allowances scheme for energy-efficient equipment has been extended to 31 December 2030 (Revenue eBrief 028/2026). Qualifying equipment generally needs to be on SEAI’s Triple E Register. Ask your accountant how a grant affects the claim. Solar on farm buildings doesn’t get the 0% VAT rate that applies to private homes (Revenue); VAT-registered farmers can usually reclaim VAT on business inputs.

Getting a TAMS solar application right

  • Use real data. Base the On Farm Solar PV Survey on 12 months of bills for the farm MPRN, not estimates.
  • Separate the house. If the farmhouse shares the meter, expect DAFM to look only at on-farm demand.
  • Check the roof. Old fibre-cement or fragile sheeting may need replacing before panels go on, and the cost of that work may not be eligible.
  • Plan the connection. Many farms are single-phase. ESB Networks’ micro-generation (NC6) covers about 6kVA single-phase; larger systems go through mini-generation (NC7), which needs an application, a fee and a technical study.
  • Keep timing in mind. Approval, the ESB Networks connection and the claim deadline must all line up. Don’t order equipment before approval.

How to decide

  1. Get 12 months of farm electricity bills and size the system to your actual demand.
  2. Get quotes from installers experienced with farm roofs, TAMS surveys and SEAI paperwork.
  3. Compare the net cost under TAMS (60%, if selected) against SEAI (45% or the table amount, now).
  4. Weigh the value of a battery: TAMS grant-aids one; SEAI doesn’t.
  5. Factor in timing: waiting for Tranche 14 selection versus starting sooner with an SEAI letter of offer.

Teagasc’s dairy guidance cites payback of around three to four years with the TAMS grant. Ask installers to show payback under each route using your own data. Our solar panels for farms guide covers planning, grid connection and farm loads in more detail.

FAQs

What is the TAMS solar grant rate?

60% of eligible cost under the TAMS 3 Solar Capital Investment Scheme, with a separate €90,000 investment ceiling.

When does TAMS Tranche 14 close?

Agriland reported that Tranche 14 opened on 5 September 2026 and closes on 4 December 2026. Confirm on DAFM’s agfood.ie portal.

Can I apply for TAMS and the SEAI grant for the same solar panels?

No. Aid can’t be combined, and DAFM has warned of a 100% penalty for double-funded solar.

Does TAMS cover solar for the farmhouse?

DAFM signalled from Tranche 11 that domestic dwellings would be excluded. The SEAI domestic solar grant may be an option for the house instead.

Get your solar quote today

Get your solar quote today. Tell us about your farm, your sheds and your usage, and we’ll connect you with SEAI-registered installers who can size a system and quote for TAMS or the SEAI route.

About Us

Get your solar quote today. We help Irish homeowners understand their solar options, explore SEAI grants and request quotations from SEAI-registered installers.

WhatsApp us