Solar advice, grants and quotes across Ireland

Buy solar panels Ireland: supply-only vs fully installed

If you want to buy solar panels Ireland gives you two broad routes: buy the equipment yourself (supply-only) or buy a fully installed system from an installer. For a grid-connected home, the second route is usually cheaper once you factor in VAT and the grant, and it’s the only one that keeps you on the right side of the electrical rules without hiring a registered electrician anyway. Here’s why, with every rule checked on 26 October 2026.

Supply-only vs installed: the key differences

Supply-only (you buy the kit)Fully installed (private home)
VAT on equipmentStandard rate, 23%0% on supply and installation
SEAI grantNot availableUp to €1,800 panels + €600 battery, via a registered company
Electrical workMust still be done by a Registered Electrical ContractorIncluded, with completion certificate
ESB Networks NC6Your electrician must notifyInstaller handles it
Warranty claimsYou deal with the seller or makerInstaller is your first point of contact
Design and sizingYour responsibilityInstaller designs to your roof and usage
Sources: Revenue, SEAI, CRU, ESB Networks. Checked 26 October 2026.

VAT: why supply-only costs more

Since 1 May 2023, the supply and installation of solar panels on a private dwelling is zero-rated, provided the same business supplies and installs them under one contract. Batteries and ancillary equipment supplied and installed under that contract are zero-rated too. But “the standard rate will apply to the supply of the solar panels if there is no installation contract” (Revenue). SEAI confirms a standalone battery installation carries 23% VAT (SEAI).

Here’s an illustrative example, using made-up prices, of how that plays out:

Supply-only routeInstalled route
Equipment (ex VAT, assumed)€3,000Included in package
VAT on equipment€690 (23%)€0
Electrician, scaffolding, certification (assumed)€1,500 + VAT where chargedIncluded
Installed package price (assumed)–€6,000
SEAI grant (4kWp)€0−€1,800
Net cost€5,190 or more€4,200
Illustrative only, with assumed prices. Real costs vary; the point is the effect of VAT and the grant.

The grant needs a registered installer

SEAI’s solar electricity grant pays €700 per kWp up to 2kWp, €200 for each extra kWp up to 4kWp (panels capped at €1,800) and €600 for a battery of 5kWh or more, so up to €2,400 (SEAI). To get it, “You must select an SEAI registered company”, apply before any work starts and wait for approval. The home must have been built and occupied before 2025. Buying panels yourself rules all of that out. Qualifying welfare households can get up to €9,000 under the enhanced grant; see our free solar panels guide.

Electrical and grid rules still apply

Even if you buy the kit, you can’t legally wire it in yourself. The CRU says you should always use a Registered Electrical Contractor for electrical work in your home and that this is required by law (CRU). ESB Networks requires a micro-generator to be installed by a registered electrical contractor to Safe Electric standards, with an inverter compliant with IS EN50549-1 and an NC6 notification with a type test certificate (ESB Networks). Since 6 January 2025, installers should also choose devices on ESB Networks’ Low Carbon Technology Register (ESB Networks).

So if you buy panels online, check before you order that they, the inverter and any battery are on the register, and that an electrician is willing to install and certify equipment they didn’t supply. Ask early: an electrician may be reluctant to take on workmanship responsibility for kit they didn’t choose.

Buying a battery later

A common reason people look at buying equipment separately is to add a battery to an existing system. The rules here changed in 2026: SEAI now pays a €600 grant for a battery of 5kWh or more, and existing solar owners can apply for it separately (SEAI). It still has to be installed by an SEAI-registered company, and a standalone battery installation carries 23% VAT, not 0% (SEAI). If you’re installing panels now and think you’ll want storage, getting a battery-ready (hybrid) inverter, or pricing the battery into the same contract, avoids that VAT.

When buying supply-only can make sense

  • Off-grid uses: a shed, workshop, boat or campervan that isn’t connected to your home’s supply. Electrical safety still matters; get qualified advice.
  • Businesses: VAT-registered businesses can generally reclaim VAT on purchases used for taxable supplies (Revenue), so the 23% matters less. They’d still need a registered contractor and should check SEAI grant terms before buying anything.
  • Replacement parts: a matching panel or inverter for an existing system, fitted by your electrician.

For a standard grid-connected home, though, supply-only means paying VAT you wouldn’t otherwise pay and giving up the grant. It also leaves you to sort out design, sizing, compatibility between panels, inverter and battery, and warranty claims yourself, all of which an installer normally carries.

How to buy solar panels Ireland-wide the smart way

  1. Decide what you want: panels only, panels plus battery, or panels with a diverter.
  2. Get two or three written, itemised quotes from SEAI-registered companies. Our compare solar quotes guide shows what to compare.
  3. Check named products, warranties and the grant shown separately.
  4. Apply for the SEAI grant and wait for approval before any work.
  5. Let the installer handle the NC6, install, certification and grant paperwork.

If you’d like to understand the panel options first, our best solar panels guide explains what to look for in module specs and warranties.

FAQs

Is there VAT on solar panels in Ireland?

Not when supplied and installed together on a private home: that’s zero-rated. Panels bought without installation are charged at the standard rate of 23%.

Can I buy solar panels and get the SEAI grant?

Only if an SEAI-registered company supplies and installs them under a contract, after your grant is approved. Self-bought panels don’t qualify.

Can I buy solar panels online and install them myself?

You can buy them, but the electrical connection is restricted work that must be done by a Registered Electrical Contractor, and ESB Networks must be notified on an NC6.

Where can I buy solar panels in Ireland?

For a home system, the practical route is through an SEAI-registered installer, who supplies and installs at 0% VAT. Supply-only sellers exist but you lose the grant and pay standard-rate VAT.

Is it cheaper to buy a solar kit?

Usually not for a grid-connected home, once you add 23% VAT, an electrician’s costs and the lost SEAI grant.

Get your solar quote today

Get your solar quote today. Skip the VAT and keep the grant: tell us about your home and we’ll connect you with SEAI-registered installers for itemised supply-and-install quotes. Call 089 450 4544 with any questions.

About Us

Get your solar quote today. We help Irish homeowners understand their solar options, explore SEAI grants and request quotations from SEAI-registered installers.

WhatsApp us